Note 1 |
Height minimum 2 meters above
roof surface and any roof of any buildings in a distance of 100 meter or
according to local requirements. For
gas combustion these recommendations can often be less restrictive. |
|
|
Note 2 |
Chimney should be supported
sufficiently at bottom and at top based on strength calculations
performed. Insulation thickness (2 x) according to local requirements, to
be added the necessary diameter "B". |
OTHER
FACILITIES
|
|
Note 3 |
Flue pas piping to be as short
as possible, and bends as few as possible (preferable two). Angels of bends to be minimum
120°C. |
|
Note
4 |
Above
heat capacities are net output, based on TT BOILERS high standard
efficiencies. Diameters given are approximate value. In case of doubts, use a size
higher. |